#separator:Pipe #html:true #notetype:Basic #deck:ASPICE 4.1::03 The VDA Scope #tags:aspice::lesson-03 #guid column:3 #columns:Front|Back|GUID List the five base processes of the recommended VDA Scope.|MAN.3 Project Management · SUP.1 Quality Assurance · SUP.8 Configuration Management · SUP.9 Problem Resolution Management · SUP.10 Change Request Management. (Guidelines Fig. 1-1, p. 29)|aspice-03-01 Besides the base five, what must the recommended VDA Scope include?|At least one engineering plug-in: SYS.2–SYS.5, SWE.1–SWE.6, HWE.1–HWE.4, or MLE.1–MLE.4 with SUP.11.|aspice-03-02 What is the PAM's plug-in concept?|The system V sits at the top; domain disciplines such as SWE and HWE plug in beneath it; management and support processes are domain-independent and apply at every level. (PAM Annex C.1, p. 153)|aspice-03-03 Name four flex processes, outside the base and the plug-ins of the recommended VDA Scope.|Any four of: ACQ.4 Supplier Monitoring, MAN.5 Risk Management, MAN.6 Measurement, SYS.1 Requirements Elicitation, VAL.1 Validation, SPL.2 Product Release, PIM.3 Process Improvement, REU.2 Management of Products for Reuse.|aspice-03-04 What does deviating from the recommended scope need?|A documented rationale tied to the assessment purpose. (Guidelines pp. 29–30)|aspice-03-05 Seat-Heat has no QA function and asks to mark SUP.1 “not applicable”, without the sponsor's approval. What happens?|It stays in scope and is rated, usually N. “Not applicable” needs the sponsor's approval, and non-existence of evidence is not a valid reason to exclude. (Guidelines pp. 29–30)|aspice-03-06 Which processes make up Seat-Heat's assessment scope, and how many are there?|The five base processes plus the software plug-in SWE.1–SWE.6: eleven.|aspice-03-07 A software-only supplier has no system development. What do the SWE processes use in place of system requirements?|The given operating environment; stakeholder requirements can be used as their basis, and traceability can then be ensured between stakeholder and software requirements. (PAM SWE.1.BP1 note 3, p. 44; SWE.1.BP5 note 12, p. 45)|aspice-03-08 In one sentence each: what does SUP.9 manage, and what does SUP.10 manage?|SUP.9: problems (something is wrong: analyse the cause, track to closure).
SUP.10: change requests (a change is wanted: analyse impact, approve before implementing, trace both ways). (PAM pp. 83–86)|aspice-03-09 A problem leads to a change request. What must the two records do?|Trace to each other (SUP.10.BP4).|aspice-03-10 Why does a peer review of a pull request not satisfy SUP.1 on its own?|A peer review is verification by a colleague. SUP.1 quality assurance must be performed without conflicts of interest; “no self-monitoring” is the PAM's example. (PAM SUP.1.BP1 note 1, p. 79)|aspice-03-11 SWE.4, SWE.5, SWE.6: what does each verify, and against what?|SWE.4: units against the detailed design.
SWE.5: components against the architecture, plus the integration.
SWE.6: the integrated software against the software requirements.|aspice-03-12 A HIL suite checks each software requirement on the fully integrated build. Which process?|SWE.6 Software Verification.|aspice-03-13 What is SUP.8 Configuration Management for, in brief?|Establishing and maintaining the integrity of configuration items and baselines, and making them available to affected parties. (PAM p. 81)|aspice-03-14