#separator:Pipe #html:true #notetype:Basic #deck:ASPICE 4.1::11 Lifecycles, gates and approvals #tags:aspice::lesson-11 #guid column:3 #columns:Front|Back|GUID Does ASPICE define phases or an order of processes?|No. The PAM “neither predefines, nor discourages, any order”. Order belongs to the project's own lifecycle (MAN.3.BP2 define the project lifecycle). (PAM §3.3.4, pp. 26–27)|aspice-11-01 If not a sequence of phases, what does the V show?|Which work products must be consistent and traceable with which.|aspice-11-02 Where does a stage-gate model sit on WHAT, HOW, DOING?|HOW: it is a lifecycle, which the assessor maps onto the indicators like any other.|aspice-11-03 A feature goes back from “Verified” to “Candidate frozen” after a failed test. Is that a deviation from ASPICE?|No: iteration inside the team's own lifecycle is allowed.|aspice-11-04 What does AGE.RL.1 say about plans and the customer's release planning?|Significant gaps between the plans and the customer's release planning downrate MAN.3.BP4, BP9 and SPL.2.BP1. (Guidelines p. 77)|aspice-11-05 What is SPL.2 Product Release for, and is it base or flex?|To control the release of a product to the intended customer. It is flex. (PAM pp. 30–32)|aspice-11-06 Name the eight base practices of SPL.2.|BP1 content and release criteria · BP2 release package · BP3 unique identification · BP4 build from controlled items · BP5 approval before delivery · BP6 release note · BP7 support terms · BP8 deliver.|aspice-11-07 Besides the decision, what does 13-13 Product release approval identify?|The release date and the name and role of the approver. (PAM Annex B, p. 138)|aspice-11-08 The final “Released” gate approval is primarily evidence for which process?|SPL.2 (BP5 approval before delivery); an assessor looks for information item 13-13.|aspice-11-09 Which base practice's note says a complete, consistent baseline can support a gate approval?|SUP.8.BP7. (PAM p. 82)|aspice-11-10 Which ASPICE process explicitly requires independence?|Only SUP.1 Quality Assurance (“no self-monitoring”). Independence rules for verification come from other standards, e.g. ISO 26262. (PAM SUP.1.BP1, p. 79)|aspice-11-11 In which process are system requirements analysed, and what is SYS.1?|SYS.2 System Requirements Analysis. SYS.1 is Requirements Elicitation: stakeholder needs and their changes.|aspice-11-12 In the recommended VDA Scope, is VAL.1 Validation base, plug-in or flex?|Flex.|aspice-11-13 Can Seat-Heat’s project manager also be the project’s quality engineer?|No. Independent quality assurance must be free of conflicts of interest, so the project manager or a developer of the same project may not take that role, though they may in another project. (Guidelines §3.23.2.1, p. 192)|aspice-11-14